Regulatory Reference

Danish EPC Compliance

Denmark's Energimærkning scheme uses Be18 to assess commercial buildings. On-site renewable generation from wind turbines and solar is credited in the calculation — but is capped at 25 kWh/m²/year combined. MEPS is coming, with specific threshold levels pending secondary legislation.

Framework at a glance

Danish Energimærkning — non-domestic
Framework nameEnergimærkning (energy labelling)
Governing legislationLovbekendtgørelse nr. 1253 af 22. oktober 2025 om fremme af energibesparelser i bygninger
Primary authorityEnergistyrelsen (Danish Energy Agency)
CertificateEnergimærke (energy label)
Assessment toolBe18 (Bygningers Energibehov)
Rating scaleA2020, A2015, A2010, B through G
On-site generation cap25 kWh/m²/year combined (wind + solar) — statutory ceiling in Be18
Current minimum standardNone — Energimærkning is a disclosure obligation; no minimum class required to let or sell
MEPSComing under EPBD 2024; specific threshold levels pending secondary legislation
Certificate validity10 years

The generation cap — what makes Denmark different

Of the five countries covered on this site, Denmark is the only one with a statutory cap on on-site renewable generation credit in the energy assessment. Be18 caps the combined credit from wind turbines and solar cells at 25 kWh/m²/year reduction in primary energy need. This is a hard ceiling, not a proportional limit. Generation above this threshold delivers no additional benefit in the energimærke calculation.

This is confirmed from the CA-EPBD Denmark 2020 primary report and is material for any building owner or practitioner working with on-site generation in Denmark.

What this section covers

Regulatory reference pages
Framework

Legislation and how the system works

Lovbekendtgørelse 1253/2025, Energistyrelsen, the A2020/A2015/A2010 scale, certified firm requirement.

  • Primary act
  • Energistyrelsen
  • Be18 tool
Deadlines

What is required and when

Scheme in force since 2006, infringement proceedings opened July 2026, MEPS pending — 2027/2030/2033 targets.

  • In force
  • infringement Jul 2026
  • MEPS confirmed pending
Penalties

Consequences of non-compliance

Criminal bøde (fine) with building size aggravation; Energistyrelsen administrative fines; compliance order mechanism.

  • §32 criminal fine
  • §32a administrative bødeforlæg
  • building size aggravation
Methodology

How the assessment works

Be18 monthly calculation, 25 kWh/m²/year on-site generation cap (wind + solar combined) — stated explicitly.

  • Be18
  • 25 kWh/m² hard cap
  • primary energy basis

Understanding what this means for your building → Owner pathway

Every claim on this page is sourced. Sources and verification dates are on each sub-page. Verified: 25 Aug 2026.