DKK 160 million for zero-emission heavy trucks and their depot charging infrastructure. Previous rounds sold out in minutes. Applications are first-come, first-served — and the deadline is 30 September 2026.
A Danish grant scheme supporting the purchase and leasing of zero-emission heavy trucks (N2/N3 class) and associated depot charging or hydrogen refuelling infrastructure. Eligible costs include the charging equipment, installation, and grid connection for depot charging at commercial and logistics facilities.
Administered by Vejdirektoratet (Danish Road Directorate).
Source: Vejdirektoratet. Verified: 1 Sep 2026.
Transport and logistics operators with zero-emission heavy trucks or plans to acquire them. Companies using leased vehicles are eligible following a rule relaxation in June 2025.
Eligible costs: depot charging equipment, installation, and grid connection. Passenger car charging and residential charging do not qualify.
DKK 160 million available in the current round. Previous rounds sold out extremely rapidly — one 75 million DKK round was fully committed in 8 minutes. The scheme operates on a first-come, first-served basis once the application window opens.
Application deadline: 30 September 2026. Apply early — do not approach the deadline on the assumption that budget will still be available.
This scheme is narrow in scope — it applies only to operators of zero-emission heavy trucks with depot charging requirements. A commercial property owner or hotel group without heavy transport operations is not in scope.
For commercial properties that do house logistics operators or transport companies as tenants, the grant may be relevant to the tenant's investment in depot infrastructure — which in turn affects the property's EV charging infrastructure requirements and potential capital investment.
Depot charging under this scheme may stack with Erhvervspuljen energy efficiency grant if the cost bases are separate — confirm with Vejdirektoratet and Energistyrelsen before assuming stacking is available.