Sweden FAQ

When will Sweden introduce MEPS?

Sweden's MEPS thresholds for existing commercial buildings are under development by Boverket but have not been enacted. The October 2024 preliminary figures are calculations for consultation purposes only — not proposed policy.

The EU-level obligation is confirmed. EPBD 2024 (Directive 2024/1275) requires EU member states to introduce Minimum Energy Performance Standards (MEPS) for non-residential buildings by 1 January 2027, targeting the worst-performing 16% of non-residential stock by 2030 and the worst-performing 26% by 2033. Sweden, as an EU member state, has a transposition obligation.

The Swedish implementation timetable is as follows. SFS 2026:744 (in force 1 July 2026) and SFS 2026:869 (in force 1 October 2026) implement the structural EPBD 2024 framework changes. Boverket's BED (BFS 2007:4) and CEX (BFS 2007:5) prescription amendments — which will set the specific MEPS thresholds — were planned for publication in October 2026 alongside SFS 2026:869.

The figures that circulate most widely — an aggregate preliminary threshold of 241 kWh/m²/year for 2030 and 193 kWh/m²/year for 2033 — come from Boverket's October 2024 report on preliminary calculations. Boverket itself labels these explicitly as preliminary and warns that existing energideklaration data may not be directly comparable to these figures. They are not proposed policy. They will be revised through the prescription process.

Nordea Equities estimates approximately 14,000 commercial buildings will require renovation by 2030 and approximately 23,000 by 2033. Buildings with direct electric heating or fossil fuel systems are most exposed, as these will largely need to be replaced as part of any qualifying renovation.

Primary source: Boverket EPBD implementation page

→ Swedish EPC deadlines in full