Wind turbines and solar PV are explicitly excluded. BESS as a standalone installation does not qualify. But BESS bundled as an enabler of a qualifying heating or process-optimisation project may be includable — if the application frames it correctly.
Erhvervspuljen (the Business Pool) is a grant programme administered by Energistyrelsen (Danish Energy Agency) through SparEnergi.dk. It funds energy efficiency improvements in Danish commercial buildings and industrial processes. The grant is calculated per unit of energy saved and per tonne of CO2 reduced — not as a fixed percentage of capital cost.
Source: SparEnergi.dk Erhvervspuljen. Verified: 1 Sep 2026.
Danish businesses investing in qualifying energy efficiency improvements. Applications are processed in order of submission once the pool opens — first-come, first-served when budget nears exhaustion.
What qualifies: heating system conversion (gas boiler to heat pump or district heating), process plant optimisation, internal waste heat recovery, heat pump installation, LED redesign (full system, not lamp-only), HVAC upgrade, building automation and controls. AI energy management systems qualify as building controls.
What does not qualify: wind turbines (explicitly excluded), solar PV (explicitly excluded), standalone BESS, EV charging.
BESS as a standalone battery installation does not qualify. However, BESS bundled as part of a qualifying CO2-reduction project — where the BESS enables or enhances the efficiency of a heating conversion or process-optimisation project — may be includable where its contribution can be captured in the CO2/energy-saving calculation.
An application that frames BESS as an enabler of a qualifying measure rather than as a standalone battery claim has a stronger eligibility position. Confirm the framing with Energistyrelsen before submission.
The Be18 energimærke cap on on-site generation (25 kWh/m²/year combined wind and solar) does not affect Erhvervspuljen eligibility — but it affects how a Danish building owner should sequence and size their energy investment. Wind turbines that produce operational energy savings above the Be18 certification ceiling still save energy and reduce CO2; they simply do not improve the energimærke beyond the cap. An Erhvervspuljen application for a heating measure can proceed independently of the generation cap.
The pool closes in November 2026 or when the annual budget is exhausted, whichever comes first. For 2026, grant rates per kWh saved and per tonne CO2 were doubled for several project types compared to prior years.
Verified consumption data is required for the application — begin data collection immediately on deciding to apply. A complete application ready before September has a materially better chance than one submitted in October as the pool nears exhaustion.
An EED energy audit action plan (gi-dk-eed-energy-audit-obligation) provides the technical basis for an Erhvervspuljen application — audit recommendations with quantified savings create a stronger submission. The two are designed to work together.