Developers

Integrating energy infrastructure at planning stage produces a better SBEM outcome at lower lifetime cost than any retrofit after occupation.

Architect reviewing building energy performance design at planning stage

An EPC assessment on a completed building starts from what exists. An EPC strategy at design stage starts from what is possible — and the range of possible outcomes is substantially wider. The fabric specification, the heating system selection, the orientation and roof design, the incoming supply sizing, and the provision for on-site generation are all live decisions at planning stage. After occupation, most of them are fixed.

The financial consequence of integrating energy infrastructure at design stage rather than retrofit is the difference between a system specified for the building's actual thermal and electrical profile and a system specified for the building as it was built before the EPC conversation started. The former produces a better SBEM outcome, lower installation cost, and better whole-life performance. For a developer building to comply and sell or let at a green premium, this is the correct conversation to have before planning submission, not after practical completion.

To discuss a current project, contact Rune directly.

Contact Rune

Full pathway content — what is needed before this section can be completed

This section covers a single introductory page. Three further pathway stages — covering design-stage SBEM strategy, on-site generation integration at planning, and the handover from design to construction — are in development for Phase 2.

Completing those stages requires technical input from HNordic's engineering team (Rune) on five specific areas:

1. Design-stage SBEM inputs — the levers available before construction

The full methodology page (UK regulation — methodology) covers SBEM for completed buildings. Design-stage SBEM is different: fabric specification, glazing ratio, heating system selection, and generation infrastructure are all variables at planning stage. The developer pathway needs Rune's input on: which design decisions produce the largest SBEM improvement, in what order; what the typical band improvement ranges are for design-stage wind and solar integration at new-build scale; and how the design-stage SBEM model differs from a post-completion assessment in practice.

2. On-site generation at planning — structural and grid considerations

Commercial developments have different planning constraints from retrofit. Generation infrastructure specified at planning stage can be integrated into the structural design — turbine foundations, roof-integrated solar, battery storage rooms — rather than retrofitted onto a completed structure. Rune's input needed on: what HNordic's engineering team establishes at pre-planning stage; what the structural integration requirements are for cylindrical wind turbines on new-build commercial structures; and what incoming supply sizing decisions at planning stage open or close for generation capacity.

3. Country-specific design-stage requirements

Sweden, Ireland, Denmark, and Norway each have design-stage EPC obligations — Sweden's energideklaration requirement for new buildings, Ireland's NEAP/iSBEMie application to new-build, Denmark's Be18 requirement including the 25 kWh/m²/year generation cap, and Norway's NS 3031:2025 application to new construction. Rune's input needed on how HNordic's design-stage integration approach applies in each jurisdiction.

4. The development economics of compliance-by-design

The investment case for design-stage integration is structurally different from the retrofit case. There is no brown discount to recover — the asset is being built to a standard. The financial case is: lower whole-life cost than retrofit, higher sale or lease value from first occupation, and reduced risk of stranded asset status before the building has generated its first rent. Rune's input needed on: real project cost data for design-stage versus retrofit integration (anonymised); the typical SBEM band improvement on a new commercial development with full integration versus without.

5. The practical process — from pre-planning to handover

Building owners and project managers who arrive at this page via search are asking a practical question: what does working with HNordic look like at design stage, and when do they need to start the conversation? The pathway page needs Rune's input on: when in the planning process HNordic needs to be engaged; what information is needed at that stage; what the deliverable is at pre-planning versus post-planning versus construction stage.