Irish non-domestic BER assessments use NEAP with iSBEMie v5.7b — released 8 July 2026. On-site wind generation is explicitly included and uncapped. A wind turbine also contributes to the Renewable Energy Ratio required under NZEB rules for new buildings.
NEAP (Non-Domestic Energy Assessment Procedure) is Ireland's official methodology for non-domestic BER calculation. The default calculation software is iSBEMie — an Ireland-adapted version of SBEM, developed by BRE for SEAI, based on the UK's National Calculation Methodology but adapted for Irish climate data, building activity types, and energy factors.
Current version: iSBEMie v5.7b — released 8 July 2026.
Any reference to iSBEMie v5.5h or v5.6a as the current version is superseded. The version history matters: v5.6a (from 13 July 2023) introduced updated electricity factors; v5.7b (July 2026) introduced further updates including revised primary energy and CO₂ factors under EPBD 2024 implementation.
iSBEMie v5.7b download: seai.ie
iSBEMie v5.7b Technical Manual (June 2026): seai.ie
SEAI NEAP page (primary): seai.ie/ber/support-for-ber-assessors/neap
— Verified: 25 Aug 2026
| NEAP Modelling Guide Q2 2026 | Primary operational guidance for assessors | https://seai.ie/sites/default/files/2026-05/SEAI-NEAP-Modelling-Guide-Q2-2026.pdf |
| NEAP BER Survey Guide v3.0 (May 2026) | Survey and publication guidance | https://seai.ie/sites/default/files/2026-05/NEAP-Survey-Guide-V3.0.pdf |
| iSBEMie v5.7b Technical Manual | Calculation methodology reference | https://seai.ie/sites/default/files/2026-06/SBEMie_Technical_Manual.pdf |
| TGD Part L 2022 | Part L energy requirements for new buildings | From SEAI building regulations page |
| SEAI NEAP home | Software, guidance, and assessor support | https://www.seai.ie/ber/support-for-ber-assessors/neap |
There is no separate accreditation body. SEAI registers and oversees BER assessors directly. Assessors must meet the qualification and examination requirements set by SEAI for their building category (3, 4, or 5) and use SEAI-approved software.
SEAI also validates third-party NEAP software packages (dynamic simulation and SBEM interface tools) against the NEAP framework. Approved packages as at August 2026: G-ISBEM, DesignBuilder SBEM, Virtual Environment (IES).
Source: SEAI NEAP page (primary, retrieved 2026-08-25) — Verified: 25 Aug 2026
A significant change was introduced in iSBEMie v5.6a (from 13 July 2023):
Primary Energy Factor for electricity: 1.75 (reduced from 2.08 in v5.5h)
CO₂ Factor for electricity: 0.224 kg CO₂/kWh (reduced from 0.409 in v5.5h)
These updated factors reflect Ireland's increasingly renewable electricity grid. Further updated primary energy and CO₂ factors were implemented in NEAP on 24 May 2026 under EPBD 2024 implementation.
The lower primary energy factor (1.75 vs 2.08) means each kWh of on-site wind generation displaces 1.75 kWh of primary energy from the BER calculation. The magnitude is smaller than under the pre-2023 methodology, but the credit remains uncapped and material.
Source: SEAI NEAP page — electricity factors table — Verified: 25 Aug 2026
iSBEMie / NEAP calculates monthly primary energy and CO₂ emissions. Key inputs:
The calculation produces primary energy in kWh/m²/year and CO₂ in kg CO₂/m²/year, which feed into BER class assignment.
NEAP/iSBEMie v5.7b explicitly includes on-site wind generation as an input to the BER calculation. Wind turbine output reduces the building's calculated delivered energy requirement, directly improving both primary energy demand and CO₂ emissions in the assessment.
There is no statutory cap on on-site generation credit in NEAP/iSBEMie — unlike Denmark's Be18, which caps combined wind and solar credit at 25 kWh/m²/year. Ireland credits on-site wind generation without a ceiling.
The mechanism: in iSBEMie, renewable generation is entered as part of the energy systems specification. The calculation reduces primary energy and CO₂ output accordingly. The UK SBEM documentation (on which iSBEMie is based) confirms that wind turbines are modelled using annual yield figures entered by the assessor, typically derived from MCS certification or site-specific output data. The iSBEMie Technical Manual (v5.7b, June 2026) is the authoritative source for the exact wind turbine calculation methodology.
Source: SEAI NEAP page (primary); iSBEMie Technical Manual — Verified: 25 Aug 2026
iSBEMie also calculates the Renewable Energy Ratio (RER) — the proportion of the building's energy requirement met by renewable sources. The NZEB standard (TGD Part L 2022) requires a RER of at least 20% for new non-domestic buildings. A wind turbine contributes directly to the RER calculation.
A new commercial building that would not otherwise meet the 20% RER threshold can satisfy the requirement through on-site wind generation. SEAI confirms in iSBEMie patch release notes that multiple on-site renewable systems (e.g. wind + solar PV combined) are both recognised and individually credited in the RER calculation.
The RER benefit is distinct from and additional to the primary energy credit: a wind turbine improves the BER class and contributes to NZEB compliance simultaneously.
Source: SEAI building regulations and standards page — Verified: 25 Aug 2026
A provisional BER can be issued for a new building based on plans before construction is complete. Specifying an on-site wind turbine at design stage allows the wind generation contribution to be incorporated into the provisional BER from the outset — which affects BER class, RER compliance, and the building's position in the market from the moment it is completed. Retrofitting a generation system after practical completion costs more and requires reassessment.
Understanding what this means for your building → Owner pathway
iSBEMie v5.7b confirmed as current from SEAI NEAP page, live retrieval August 2026.