Irish Incentives

SEAI Non-Domestic Microgeneration Grant

Up to €162,600 for solar PV installations up to 1,000 kWp. Battery storage explicitly does not qualify — it must be funded separately. The grant is a refund model: the applicant pays the full cost upfront.

What it is

The Non-Domestic Microgeneration Grant (NDMG) provides a capital grant for solar PV installations at commercial, agricultural, public sector, and community sector premises in Ireland. Maximum grant: €162,600 for systems up to 1,000 kWp. Systems larger than 1,000 kWp receive the same maximum.

Administered by SEAI. Continuous scheme.

Source: SEAI business grants. Verified: 1 Sep 2026.

Who qualifies

Commercial, agricultural, public sector, and community sector applicants installing solar PV in Ireland. Mixed-use sites assessed on MPRN registration.

Battery storage does not qualify. BESS is explicitly excluded from NDMG — it can be added alongside a solar installation but is not grant-funded under this scheme and must be budgeted separately.

EV chargers are covered under a separate scheme — not NDMG.

What it pays

Up to €162,600 for solar PV systems up to 1,000 kWp. Above 1,000 kWp, the maximum is the same — larger systems receive no additional grant.

Refund model. The applicant pays the full installation cost upfront and receives the grant from SEAI after commissioning and approval. This creates a cash flow requirement — a building owner expecting pre-payment will encounter a gap that should be budgeted in advance.

NDMG as a stacking partner

NDMG is relevant to a broader energy installation as a complementary funding route for the solar component. A commercial property installing solar PV (NDMG-funded) alongside BESS (separately funded) creates the generation and storage combination that maximises on-site consumption and BER improvement. NDMG funds the generation component; EXEED can fund the broader project of which solar PV is a part.

The grant cannot double-fund the same cost — NDMG and EXEED apply to different budget lines.

How to apply

Apply via SEAI before installation. Confirm current eligibility requirements and the MPRN assessment process with SEAI directly.

→ Irish incentives overview → · SEAI EXEED → · Irish regulation →