Regulatory Reference — Ireland

Irish BER Deadlines

Ireland transposed the simplified BER scale before the EU deadline, making it one of the early EPBD 2024 movers on format. MEPS for existing commercial buildings is pending secondary legislation. The European Commission opened infringement proceedings against Ireland on 15 July 2026 for incomplete full transposition notification.

Confirmed deadlines in force

1 July 2008 — BER mandatory at sale and rental of non-domestic buildings

BER certificates are mandatory for all new non-domestic buildings where planning permission was applied for on or after 1 July 2008. At sale or rental of existing non-domestic buildings, a BER must be provided to prospective buyers or tenants before agreement is reached.

Applies to: New non-domestic buildings (planning applied from 1 July 2008). Existing non-domestic buildings at point of sale or rental.

Status: In force

Note: A transitional exemption applied to non-domestic buildings where planning was applied before 30 June 2008 and the building was substantially completed by 30 June 2010.

Source: Law Society Ireland BER guidance (primary — citing S.I. No. 666 of 2006) — Verified: 25 Aug 2026

25 October 2022 — NZEB standard for all new non-domestic buildings

TGD Part L 2022 (Technical Guidance Document Part L — Conservation of Fuel and Energy — Buildings Other Than Dwellings) applies to all new buildings requiring planning permission from 25 October 2022. NZEB compliance is required for all new non-domestic buildings under this standard.

Applies to: All new non-domestic buildings requiring planning permission from 25 October 2022.

Status: In force

NZEB under TGD Part L 2022 requires a maximum Energy Performance Coefficient (EPC) of 0.3 and a Renewable Energy Ratio (RER) of at least 20%, calculated using NEAP/iSBEMie. The A category on the new simplified BER scale corresponds to the NZEB standard.

Source: SEAI Building regulations and standards page (primary) — Verified: 25 Aug 2026

24 May 2026 — Simplified BER scale in effect

From 24 May 2026, all new BER certificates for residential and non-domestic buildings use the simplified scale: A0, A, B, C, D, E, F, G. The previous 15-level scale (A1–A3, B1–B3, C1–C3, D1–D2, E1–E2, F, G) is retired for new certificates.

Ireland transposed this element of EPBD 2024 on time — five days before the EU deadline of 29 May 2026.

Existing valid certificates remain valid under their original scale for their full 10-year period. No reassessment is required.

Applies to: All new BER certificates from 24 May 2026.

Status: In force

Source: SEAI simplified scale page (primary); S.I. No. 168 of 2026 — Verified: 25 Aug 2026

Confirmed pending secondary legislation

15 July 2026 — European Commission infringement proceedings

The European Commission opened infringement proceedings against Ireland (and all 26 other EU member states) for incomplete formal notification of full EPBD 2024 transposition by the 29 May 2026 deadline.

What this means for Ireland specifically: Ireland transposed the BER scale harmonisation element (S.I. 168/2026) on time. However, the full EPBD 2024 transposition package — including MEPS, renovation passports, digital building logbooks, and other provisions — was not notified to the Commission by 29 May 2026. The CA-EPBD Ireland page confirms that as of 2025, government departments and SEAI were still working on plans for full EPBD 2024 transposition. The existing BER obligations under S.I. 666/2006 as amended remain fully in force.

Status: Infringement proceedings open — existing Irish BER requirements unaffected.

Source: European Commission infringement procedure announcement, 15 July 2026 — Verified: 25 Aug 2026

August 2027 — MEPS for non-residential buildings (EPBD 2024 Article 9)

EPBD 2024 Article 9 allows a 36-month transposition window from the directive's entry into force (28 May 2024), running to approximately August 2027 for MEPS specifically. MEPS enactment in Irish law is pending as at August 2026.

No enacted MEPS thresholds for existing commercial buildings exist in Ireland. The specific BER letter grade that will constitute minimum compliance is subject to Irish implementing legislation.

Applies to: Non-residential commercial buildings. Specific BER thresholds to be confirmed in Irish implementing secondary legislation.

Status: Confirmed pending secondary legislation

Source: European Commission EPBD overview; IIP EPBD Transposition Report, February 2026 — Verified: 25 Aug 2026

1 January 2030 — MEPS: worst-performing 16% of non-residential stock

The worst-performing 16% of the non-residential building stock must meet national MEPS thresholds. All new buildings must be zero-emission (ZEB).

Status: Confirmed pending secondary legislation

Market context: Dublin prime office is already defined by BER A; the yield premium between prime and secondary city centre stock is material (approximately 5% vs 7.75% per CBRE Q3 2025). The MEPS legislation has not been enacted but the market is responding before the legal obligation arrives.

Source: European Commission EPBD overview; IIP EPBD Transposition Report — Verified: 25 Aug 2026

1 January 2033 — MEPS: worst-performing 26% of non-residential stock

Status: Confirmed pending secondary legislation

Source: European Commission EPBD overview — Verified: 25 Aug 2026

Understanding what this means for your building → Owner pathway

Verified: 25 Aug 2026