RESS is Ireland's grid-scale renewable electricity auction scheme — not a grant for individual buildings. For on-site generation at commercial premises, the routes are the SEAI NDMG solar grant, SEAI EXEED capital works grant, and the Clean Export Guarantee for export revenue.
The Renewable Electricity Support Scheme (RESS) is the Irish government's main support mechanism for grid-scale onshore and offshore renewable electricity generation. It operates through competitive auctions where renewable electricity developers bid for a 15-year Contract for Difference (CfD) support arrangement. EirGrid administers the auctions.
RESS is not a grant scheme for individual commercial buildings. A building owner installing an on-site wind turbine or solar PV system for self-consumption does not apply for or receive RESS support. RESS is designed for utility-scale electricity generators exporting to the grid.
RESS 6 is expected in the second half of 2026. Five RESS auctions have been completed. The scheme aligns with Ireland's target of 80% renewable electricity by 2030.
Sources:
The Small-Scale Renewable Electricity Support Scheme (SRESS 1) was introduced for projects in the 50 kW to 1 MW range that export electricity to the grid. Unlike RESS (which uses a competitive auction), SRESS 1 provides support at centrally set tariff rates — no auction required.
Relevant to: commercial buildings with generation capacity of 50 kW to 1 MW where a proportion of output is exported. A commercial building with a 100 kW wind turbine exporting surplus generation would typically be in scope.
Not relevant to: buildings where generation is primarily for self-consumption with minimal export, or installations below 50 kW — those use the Clean Export Guarantee (CEG) under the Microgeneration Support Scheme instead.
Source:
For commercial buildings with on-site generation below 50 kW, the Microgeneration Support Scheme and its Clean Export Guarantee (CEG) is the relevant export revenue mechanism.
CEG requires a qualifying generation installation and a smart export meter. The export rate is set commercially by the supplier — a positive rate is required, but there is no government floor above zero. Review the tariff annually; rates can change with approximately 30 days' notice.
For the capital grant on the solar PV component of a combined installation, see SEAI NDMG.
RESS and SRESS 1 improve Ireland's national renewable electricity mix, which over time affects the primary energy factor applied to purchased electricity in NEAP/iSBEMie BER calculations. However, this is a national calculation parameter — it is not a building-level credit that the building owner controls.
Building-level BER improvement through on-site generation is credited directly in the NEAP calculation — and crucially, without any cap. Ireland's NEAP/iSBEMie credits the full consumed output of a qualifying on-site generation installation. This contrasts with Denmark, where the combined generation credit is capped at 25 kWh/m²/year.
See Irish BER Methodology for how on-site wind generation feeds into the NEAP calculation.