Up to £500 per socket, 75% of cost, maximum £20,000 per applicant. This scheme closes 31 March 2027 with no announced successor.
The Workplace Charging Scheme (WCS) is a government grant covering 75% of the purchase and installation cost of EV charge point sockets at eligible UK business premises — up to £500 per socket (increased from £350 on 1 April 2026), with a maximum of 40 sockets per applicant across all sites and a total cap of £20,000.
Administered by the Office for Zero Emission Vehicles (OZEV). Available in England, Wales, Scotland, and Northern Ireland.
This scheme closes 31 March 2027. OZEV has confirmed this as the final year with no successor announced. A building owner planning EV charging who defers past that date loses access to direct grant support.
Source: OZEV / Find a Government Grant. Verified: 1 Sep 2026.
UK businesses, charities, and public sector organisations with dedicated off-street parking at commercial premises. The site must have off-street parking — on-street parking does not qualify.
The 40-socket cap applies across all of an applicant's sites — not per site. A business with ten sites is not entitled to 40 sockets per site; 40 sockets is the total.
The grant is claimed by the OZEV-approved installer at point of installation — not by the building owner independently. Confirm installer OZEV approval before relying on WCS in the business case.
BESS, wind turbines, heating, and LED do not qualify under WCS. EV charging only.
On a 10-socket installation at £800 per socket installed: WCS covers £5,000 (75% × £500 cap × 10 sockets). The remaining £3,000 is eligible for Capital Allowances relief.
Applications are submitted by the OZEV-approved installer, not by the building owner. The sequence:
1. Select an OZEV-approved installer
2. Installer checks your eligibility and applies on your behalf
3. Installation proceeds
4. Installer claims the grant from OZEV
Apply before 31 March 2027. No evidence that application windows will be reinstated after this date.
WCS stacks with the Boiler Upgrade Scheme (different measures on the same property) and with Capital Allowances — Full Expensing or AIA applies to the net cost after the WCS grant is deducted. Both can be claimed on the same installation.