Founder, HNordic

Rune Holm

The EPC sequencing question – what to do first, and what that order costs or saves – is an engineering question. Rune has been running energy systems, not reading about them, for most of his working life.

Rune Holm – Founder, HNordic

An EPC compliance programme is a sequencing problem before it is anything else. Size the generation layer before you have improved the building fabric, and you have sized it for a load that is about to change. Upgrade the heating system before you understand the insulation state, and the system you install will be working harder than it needs to for the life of the installation. Each of these errors is predictable – they are what happens when individual measures are specified as independent decisions rather than as steps in a system where each one changes the conditions the next step lands on. Getting the sequence right is not a refinement. It is the difference between a compliance programme that produces the target certificate and one that produces a bill of works that has to be partially repeated.

Seven years of Norwegian maritime training, then a decade at sea working up through the ranks to Chief Engineer at twenty-nine on a vessel operating outside Brazil, produced a way of reading systems that I have not been able to switch off since. On a ship, there is no division between the component that is performing well and the system it is part of: adjusting the boiler changes the fuel consumption, which changes the heating loads, which changes the pressures across the vessel. You learn to see those dependencies before you touch anything, because the alternative is fixing a problem and creating three others. The Port of Ystad came next, where I ran the world's largest shore power installation of its kind at the time – a system with no established compliance framework for the problems it created, which required working through the safety and grounding regulations from first principles to get it operational. That discipline of finding the intent of a regulatory framework where its written rules do not yet cover the problem in front of you is the same discipline EPC improvement programmes require.

The work most directly connected to this site came at Ystads Industrifastigheter, where I managed a €33 million commercial property portfolio. When I arrived, occupancy was at 55% and the previous management had treated maintenance and energy as costs to defer. I applied the same logic I had used on ships: deferral looks like saving money and reliably destroys value. The energy improvement programmes I sequenced across the portfolio – which led to GreenBuilding and Miljöbyggnad certifications – were not run as compliance exercises. They were the documentation that changed what tenants were prepared to commit to and what financing terms the portfolio could access. By the time that work was complete, occupancy was at 99%. The EPC improvement works the same way: the certificate is the instrument that changes the financial position of the asset.

Full biography →

What I bring to this site

The sequencing of improvement programmes documented here reflects operational experience of what EPC improvement actually requires at building level, not what the regulatory summary says. The sequence has a right answer for each building type and starting position. Getting it right means the compliance path and the investment return path run together. This site is built to make that visible.

Browse the EPC database →

Get in touch

Talk to Rune

Questions about EPC sequencing, which improvements to prioritise, or whether a specific improvement path is likely to hit a target band – Rune is the right starting point.

Contact